SFGTV: San Francisco Government Television
142
142
Nov 18, 2012
11/12
by
SFGTV
tv
eye 142
favorite 0
quote 0
pier. this is the oslo opera house designed by craig and snow hitter. this is an interesting building. it's an icon for oslo. the community loves it. they may never go to a opera but there enjoying the activity to the water and what encircling this building and wraps its way up as well. this is a view from higher elevation and the public can walk around and get spectacular views across the city and you can get down and touch the water as part of this development and in some ways we took inspiration of this and how could you connect the community to the water in a creative and iconic way? then we also started out by thinking about the site conditions appreciating the opportunities and the constraints that exist at this part of the waterfront, and there is some very interesting contrast. to the north the piers create much more urban everyone to the north and then you see the bridge and the sheds and the city behind. it's a more shaded side of the pier as the development is under taken. to the
pier. this is the oslo opera house designed by craig and snow hitter. this is an interesting building. it's an icon for oslo. the community loves it. they may never go to a opera but there enjoying the activity to the water and what encircling this building and wraps its way up as well. this is a view from higher elevation and the public can walk around and get spectacular views across the city and you can get down and touch the water as part of this development and in some ways we took...
SFGTV: San Francisco Government Television
81
81
Nov 20, 2012
11/12
by
SFGTV
tv
eye 81
favorite 0
quote 0
so, along the north side nearest to pier 28, a more urban quality to that side of the pier. to the east side, the width and breadth of the pier over looks the very broad areas of the bay and of the water and coast lines beyond towards oakland. we want to provide a large views and connected views and movement along the east side of the pier. then to the south adjacent to the new street wharf project, we want to create a more recreational low rise atmosphere, the best response to these new developments by the city and to the west. alongside the seawall sites, we want to have a scale that's intimate with the embarcadaro and that is responsive to the cultural traditions that most people recognize along the embarcadaro. you'll also see squares, there is a little square up there that's red. that is the location of reds which is one of the structures on the site. and there's been another blue square off to the left that is the water mark residences that are part of the adjoining sites here and we're trying to take care of their interests as we develop the project further. you maybe
so, along the north side nearest to pier 28, a more urban quality to that side of the pier. to the east side, the width and breadth of the pier over looks the very broad areas of the bay and of the water and coast lines beyond towards oakland. we want to provide a large views and connected views and movement along the east side of the pier. then to the south adjacent to the new street wharf project, we want to create a more recreational low rise atmosphere, the best response to these new...
SFGTV: San Francisco Government Television
56
56
Nov 23, 2012
11/12
by
SFGTV
tv
eye 56
favorite 0
quote 0
so, we would not have to rebuild the piers out the back. we could remove those piers. it would be better for the community. we would create more open space. give more views behind pier 22-1/2. the historic fire building would stay there. but those piers in the water would be removed and it would move the three fire boats that we will have when this project is completed down to piers 30-32 which can easily accommodate the fire boats, it would be a great maritime use down there and would be a great facility for the fire department >> just a quick question. does this match the timing needs for the fire department? >> actually, as you're well aware, supervisor kim, we've met with you and we've been producing this project. right now currently, if we went our own road at pier 22-1/2, we'd be getting done around the end of 2017 which is basically the same time as this project. >> thank you. >> that would be perfect. any other questions? >> none. >> thank you. >> thank you. >> good afternoon, supervisors. i also will keep my comments brief and out of respect for your time. but
so, we would not have to rebuild the piers out the back. we could remove those piers. it would be better for the community. we would create more open space. give more views behind pier 22-1/2. the historic fire building would stay there. but those piers in the water would be removed and it would move the three fire boats that we will have when this project is completed down to piers 30-32 which can easily accommodate the fire boats, it would be a great maritime use down there and would be a...
SFGTV2: San Francisco Government Television
131
131
Nov 19, 2012
11/12
by
SFGTV2
tv
eye 131
favorite 0
quote 0
so, we wanted to make that view and the view between pier 28 and pier 30 a unique view and we wanted to preserve the types of finger pier type spaceses in this particular slot. so, the buildings are of similar height along that edge. additionally as you move from main street proper looking out as you come down the hill, you know that's a very, very steep hill right there. so, if you just look on the map and you see it as flat, you think, well, you can never really see anything anyway. in fact, it's quite a steep hill. as you're coming down the hill you will have views from main street out over the water that we wanted to protect. and once again, moving the arena and multi-purpose facility to the east allowed us to do that. and also you'll see our current designs for the seawall side allows us to do that. from the embarcadaro proper, we're trying to preserve as much as possible the wide view out to the waterfront. it's not perpendicular to the waterfront as it is today. we're preserving that corner with low rise, structure is low, that will allow passersby to see out to the bay. final
so, we wanted to make that view and the view between pier 28 and pier 30 a unique view and we wanted to preserve the types of finger pier type spaceses in this particular slot. so, the buildings are of similar height along that edge. additionally as you move from main street proper looking out as you come down the hill, you know that's a very, very steep hill right there. so, if you just look on the map and you see it as flat, you think, well, you can never really see anything anyway. in fact,...
SFGTV: San Francisco Government Television
83
83
Nov 25, 2012
11/12
by
SFGTV
tv
eye 83
favorite 0
quote 0
to the left there you can see part of the pier 26 to 28 pier shed building, and then you could see high dive and reds in the middle of this image and you can see the retail pavilions two to three stories high and similar in height and replicating in form the character -- in form the existing pier head buildings. these are not yet designed and they will of course start to take on a lot more character as they became designed. you can see the arena in the background just to the left. so just looking at more detail in more detail at the plan this is again the site plan at a larger scale. you can see here in more detail how the southern edge is treated with the opportunity to step down into the water and have human powered craft enter the water at that stage -- at that point. the opportunity for biofiltration. the very generous public plazas -- actually more than 50% of the site is publicly accessible area in these terrace plazas around the arena and around the retail. can you see the two retail pavilions and you can see the arena, and then on the left-hand side of the embarcadero here on th
to the left there you can see part of the pier 26 to 28 pier shed building, and then you could see high dive and reds in the middle of this image and you can see the retail pavilions two to three stories high and similar in height and replicating in form the character -- in form the existing pier head buildings. these are not yet designed and they will of course start to take on a lot more character as they became designed. you can see the arena in the background just to the left. so just...
SFGTV: San Francisco Government Television
73
73
Nov 24, 2012
11/12
by
SFGTV
tv
eye 73
favorite 0
quote 0
the port really has a liability in the pier substructure, in piers 30-32 in form of crumbling pier. warriors have agreed to repair it with their money at their risk. what it means is under the current proposal, warriors do not get a return of their investment based on our current estimates of the value of these three sources. nevermind a return on their investment. if i can have the overhead. thank you. not that one. the light one. this is a pretty simple worksheet that we work with our consultants eps to present that really looks at the qualified cost and sources for reimbursement. taking out this notion is not an interest rate but cost of capital but taking out the cost of capitol, the value if you look at the value of the three sources of reimbursement and look at them in two ways, there's the purchase credit for the seawall lot, projected isd bond, close to 55.5 million. the slight variable if you look at the fee value. if we could sell 3032, the appraiser looked at if we could sell 3032 what would the value be. 30 million. based upon calculations of what the net present value o
the port really has a liability in the pier substructure, in piers 30-32 in form of crumbling pier. warriors have agreed to repair it with their money at their risk. what it means is under the current proposal, warriors do not get a return of their investment based on our current estimates of the value of these three sources. nevermind a return on their investment. if i can have the overhead. thank you. not that one. the light one. this is a pretty simple worksheet that we work with our...
SFGTV: San Francisco Government Television
105
105
Nov 28, 2012
11/12
by
SFGTV
tv
eye 105
favorite 0
quote 0
ironically in 1984 the buildings on top of the piers burnt down but pier itself survived. in 1987 there was a proposal for development on 30, 32. by my count this is the sixth proposal to do some sort of significant development on peers 30 and 32. that is completely unique to this site, unlike no other project the port has done. as the port director, something that gives me great pause. we spent a lot of time as you brought up this morning supervisor avalos during the america's cup event authority lookinging at that pier in more detail and we determined there is an expensive proposition to remove, let alone try to rehabilitate it. it is sitting pier for us. as mentioned naturally deep berth. that is the whole reason the port exists on the western side is because we have naturally deep berths and can take advantage of that for the benefit so it is important to us. next door we are building the brandon street war f, requiring removal of peer 36, also row inforced and the building of a new park. the entire cost is 32 million. when i think about this, it will achieve something
ironically in 1984 the buildings on top of the piers burnt down but pier itself survived. in 1987 there was a proposal for development on 30, 32. by my count this is the sixth proposal to do some sort of significant development on peers 30 and 32. that is completely unique to this site, unlike no other project the port has done. as the port director, something that gives me great pause. we spent a lot of time as you brought up this morning supervisor avalos during the america's cup event...
143
143
Nov 13, 2012
11/12
by
CSPAN
tv
eye 143
favorite 0
quote 0
you had to think about that and talk to your piers about this all the time. i said no. and the conclusion that was the difference between military culture and that culture was like night and day. they serve for the bonus for the money and we serve for other reasons that we've talked about. and that's a very noble thing. and you have heard it for the last several days. war is not glorious but the service of people to their country can be glorious and you've heard some real heroes talk about this service, service is something bigger than yourself, selfless service. really important characteristics of our military culture, integrity. the fact that it's a mediocrity. it doesn't matter where you went to school it matters how you do the job. and you've seen that. in other words how would somebody out of kansas state university? i did pretty well on r.o.t.c. but besides that there were a lot of things i didn't do well oh at the university but how can somebody like that wind up as chairman other than i out lived a lot of people and hung around. but how do you do that? they look
you had to think about that and talk to your piers about this all the time. i said no. and the conclusion that was the difference between military culture and that culture was like night and day. they serve for the bonus for the money and we serve for other reasons that we've talked about. and that's a very noble thing. and you have heard it for the last several days. war is not glorious but the service of people to their country can be glorious and you've heard some real heroes talk about this...
SFGTV: San Francisco Government Television
83
83
Nov 23, 2012
11/12
by
SFGTV
tv
eye 83
favorite 0
quote 0
so, along the north side nearest to pier 28, a more urban quality to that side of the pier. to the east side, the width and breadth of the pier over looks the very broad areas of the bay and of the water and coast lines beyond towards oakland. we want to provide a large views and connected views and movement along the east side of the pier. then to the south adjacent to the new street wharf project, we want to create a more recreational low rise atmosphere, the best response to these new developments by the city and to the west. alongside the seawall sites, we want to have a scale that's intimate with the embarcadaro and that is responsive to the cultural traditions that most people recognize along the embarcadaro. you'll also see squares, there is a tt
so, along the north side nearest to pier 28, a more urban quality to that side of the pier. to the east side, the width and breadth of the pier over looks the very broad areas of the bay and of the water and coast lines beyond towards oakland. we want to provide a large views and connected views and movement along the east side of the pier. then to the south adjacent to the new street wharf project, we want to create a more recreational low rise atmosphere, the best response to these new...
SFGTV: San Francisco Government Television
79
79
Nov 17, 2012
11/12
by
SFGTV
tv
eye 79
favorite 0
quote 0
rent credits from piers 30-32, valued at 1.9 million a year. the sale price of seawall lot 30, valued at 30 million a year and new property tax revenue generate bid the yards your's development on both locations through creation of infrastructure financing district, estimated to yield about 5.8 million a year. >> to clarify the sales price is not per year, it is one time. >> one-time. the estimated total value of an infrastructure financing district, the amount that we could bond against for future property tax revenue off these two is approximately estimated to be 50 million. these values were determined by an appraisal that was conducted by the department of real estate with instructions provided by the city and port. there is then -- >> just one second. jennifer, we do have a few questions. supervisor a loss. >> thank you, chair chu. feeling a need to kick the tires a little bit. but looking at my notes here, when we had america's cup before us. >> yep. >> there was a discussion about seawall lot 330, that being a portion to use to help subs
rent credits from piers 30-32, valued at 1.9 million a year. the sale price of seawall lot 30, valued at 30 million a year and new property tax revenue generate bid the yards your's development on both locations through creation of infrastructure financing district, estimated to yield about 5.8 million a year. >> to clarify the sales price is not per year, it is one time. >> one-time. the estimated total value of an infrastructure financing district, the amount that we could bond...
SFGTV: San Francisco Government Television
59
59
Nov 29, 2012
11/12
by
SFGTV
tv
eye 59
favorite 0
quote 0
we'll be working with pier 70. it made sense for us at mta to make sure that as a stakeholder ourselves in ensuring good transportation and looking at pedestrian and bicycle and transit and traffic and parking that we also are as concerned about the quality that comes out of this. what we see is an opportunity here and i appreciate the chance to work and get ahead of this opportunity. so, the slides that i have on the powerpoint, i don't know if that's coming across -- thank you -- one of the first steps we want to do is step back and look at not just pier 30-32, but look at the bigger waterfront area. that was brought at the fisherman's wharf pier 70. to make sure that as we rollup our sleeves and get in the transportation problem solving that we're working with the community most affected who live day to day with some of the issues, but the idea of community is pretty big. operating transit, it's residents who live near the traffic and transit issue. it's our partner agencies who deal with transportation if the e
we'll be working with pier 70. it made sense for us at mta to make sure that as a stakeholder ourselves in ensuring good transportation and looking at pedestrian and bicycle and transit and traffic and parking that we also are as concerned about the quality that comes out of this. what we see is an opportunity here and i appreciate the chance to work and get ahead of this opportunity. so, the slides that i have on the powerpoint, i don't know if that's coming across -- thank you -- one of the...
SFGTV: San Francisco Government Television
97
97
Nov 25, 2012
11/12
by
SFGTV
tv
eye 97
favorite 0
quote 0
i didn't identify myself on there, but i have attended all of the public workshops for input on pier 30, 32, and i would ask this commission and the staff to direct everyone who is a negotiating party to when they attend these public meetings to shut up and identify themselves. there was a lot of furor at my table at the latest est session which was quality of life because one of the negotiators of the warriors sat at our table and had input and was very vocal and didn't identify herself with the warriors until the entire thing was over, and people freaked out. i request that there be a rule and enforced on all negotiations, particularly the golden state warriors that in the case the port, owd and particularly the warriors not participate as members of the public, and wear big badges saying who they are because people hide behind anonymity and i know because i of around the block oweb -- i don't know the golden state warriors but the know the port and oweb but i'm unusual and most are true civilians and it's unfair for them to have to argue from a person from one of these groups when
i didn't identify myself on there, but i have attended all of the public workshops for input on pier 30, 32, and i would ask this commission and the staff to direct everyone who is a negotiating party to when they attend these public meetings to shut up and identify themselves. there was a lot of furor at my table at the latest est session which was quality of life because one of the negotiators of the warriors sat at our table and had input and was very vocal and didn't identify herself with...
SFGTV: San Francisco Government Television
85
85
Nov 25, 2012
11/12
by
SFGTV
tv
eye 85
favorite 0
quote 0
pier. this is the oslo opera house designed by craig and snow hitter. this is an interesting building. it's an icon for oslo. the community loves it. they may never go to a opera but there enjoying the activity to the water and what encircling this building and wraps its way up as well. this is a view from higher elevation and the public can walk around and get spectacular views across the city and you can get down and touch the water as part of this development and in some ways we took inspiration of this and how could you connect the community to the water in a creative and iconic way? then we also started out by
pier. this is the oslo opera house designed by craig and snow hitter. this is an interesting building. it's an icon for oslo. the community loves it. they may never go to a opera but there enjoying the activity to the water and what encircling this building and wraps its way up as well. this is a view from higher elevation and the public can walk around and get spectacular views across the city and you can get down and touch the water as part of this development and in some ways we took...
SFGTV: San Francisco Government Television
123
123
Nov 8, 2012
11/12
by
SFGTV
tv
eye 123
favorite 0
quote 0
the pier item was bid out under the fourth amendment to the turner's pier cruise terminal contract. the total project is $1.3 million with $1 million going to a local lbe construction contractor, which is the sacker company which is a subcontractor to power engineering. so, we're really very pleased about that, and this is the project that's been on the books for a very long time and my kudos to everyone involved, which is too many people to mention. thanks, very great view of the bay there. motorcycle parking will be restored by the end of the month, which is something that people are concerned about. and from this hopefully we'll be able to restore the seating area as well. lastly i wanted to report on the grateful americas conference that occurred may 11. pete daly traveled to port commission with willie adams. there was a record attendance of 12,500 participants and the portmanaged, manned i guess is a better word, an exhibit for the couple of days during the conference. metro ports which is our steve adore company, had a boost and we hosted a cocktail reception for our key supp
the pier item was bid out under the fourth amendment to the turner's pier cruise terminal contract. the total project is $1.3 million with $1 million going to a local lbe construction contractor, which is the sacker company which is a subcontractor to power engineering. so, we're really very pleased about that, and this is the project that's been on the books for a very long time and my kudos to everyone involved, which is too many people to mention. thanks, very great view of the bay there....